There is a lot of peculiar smell in the air conditioner, which is related to the car owner's habit when using the air conditioner. It is suggested that the car owner should turn off the air conditioner about 3 minutes before arriving at the destination, press the AC switch to turn off the compressor, as shown in the following figure, AC is on, and then turn on the natural wind. In this way, the temperature in the air-conditioning pipeline can rise before parking and return it to the normal temperature. After parking, water droplets condensed due to temperature difference will not be in the air-conditioning pipeline, thus drying the air-conditioning pipeline and blocking the growth of mold and fungi.It is convenient for fighting and evacuation, and a circular fire lane should be set up. With the accelerating pace of urbanization, urban land is increasingly tight, which promotes the construction of high-rise buildings. Many high-rise buildings, due to poor consideration of fire prevention design and other reasons, have many congenital hidden dangers, and fires occur from time to time, causing heavy losses. In order to create convenient conditions for fire fighting and rescue work and ensure the safety of buildings, circular fire lanes should be set up around high-rise buildings. However, regardless of the size of the building, it is indeed difficult to require the circular fire lanes. Lanes can be set up along the two long sides of the building. In order to prevent the collapse of building components in case of fire from affecting the normal operation of the fire lane, the distance between the fire lane and the outer wall should be 5m. There should be no trees, overhead pipelines, etc. that hinder the operation of climbing fire engines between fire lanes and high-rise buildings. If the total length of the building exceeds 220m, a fire lane shall be set up to pass through the building. There is no inner courtyard in the building, there are ring fire lanes around it, and fire engines crossing the building need to be set up. Q: An L-shaped high-rise building has a total length of about 170m, a length of 120m along the street, and a length of 50m along the inner street (residential road). Do you want to set up fire lanes crossing the building? A: The relevant provisions of the "Construction Regulations" and "High Regulations" consider that there is no restriction on the length of the two wings on the premise of meeting the requirements of fire fighting and evacuation. The building only needs to set up a pedestrian passageway connecting the street and the inner courtyard at the part over 80m along the street, and there is no need to set up a fire lane. In the planning of fire lanes, in addition to the relevant provisions of the "Construction Regulations" and "High Regulations", attention should also be paid to青年艺术学院2018界新生入学了,梅帅、梁川、贾世聪、郝东明,黄晓露、陈倩、辛凤丹、王彤菲八位新生各自怀着对艺术的追求进入了这所学校。艺术学院的大学生宿舍,充满了欢乐、奋斗、温情、浪漫的故事。而这八位新生则要在这所学院里开始自己艺术之路的起点,这份起点充满了对人生的疑惑,对艺术的不解,对未来的一无所知,但是他们并没有退缩,紧紧抓住自己的专业,勇敢的向前奋斗。在奋斗的路上,他们笑过、哭过、感动过。这些一切都让他们紧紧的连接在一起,成为了一家人,他们在专业上互相帮助,在生活上彼此扶持,有了高兴的事情会彼此分享,有了矛盾会赶快化解,他们是一帮直率的小伙伴,是一群充满故事的年轻人,相信他们的朝气会Many people say that required JS is an asynchronous loading module, SeaJS is a synchronous load module, This understanding is actually inaccurate, In fact, the loading modules are asynchronous, However, AMD relies on the front, JS can easily know who the dependent modules are and load them immediately, while CMD relies on them nearby. It needs to change the modules into strings to parse them before knowing which modules it depends on. This is also a point that many people criticize CMD. Sacrificing performance brings convenience to development. In fact, the time taken to parse modules is so short that it can be ignored.齐军主力也在赵地南方,可以臣认为直接沿河进攻最好不过。